Vendor Shipping

Table of contents

  1. Pre-Shipping Administrative Duties
  2. Batching & Creation of Digitization Project SOW
  3. Shipping
  4. Return Shipment Procedures
  5. Considerations
  6. Truck and Dock Requirements
  7. Shipping Vendor Info

Pre-Shipping Administrative Duties

  • PAMI Manager creates an estimate of the number of items the budget will cover.
  • Preliminary batch is generated by PAMI Manager.
    • Preliminary batch data is provided to vendors to gauge cost estimate.
  • Vendor provides preliminary quote.
  • Preliminary quote is compared to budget and adjustments are made to the batch as needed to accommodate budget constraints.

Batching & Creation of Digitization Project SOW

  • Batch is created / finalized by PAMI Manager
  • Metadata inventory sheet undergoes data cleanup
  • MPC/MPA reviews box check-out list, obtains box count and pallet count information
  • MPC/MPA drafts tentative schedule for box migration and shipping dates
  • MPC/MPA reviews loading dock / shipping calendar to ensure no conflicts, creates tentative calendar appointments for potential shipping dates
    • Note: Thursdays are generally off-limits at LSC
  • MPC/MPA inquires with shipping vendors and provides the following information:
    • Pickup and drop-off locations
    • Pallet count & instructions
    • Loading dock info / requirements
    • Recipient loading dock info / requirements
  • Creation of Shipping SOW
    • Draft a final Shipment SOW (convert any quotes into PDF format)
  • Contact Procurement (2020 contacts: Joel Schlissler & Carey Weiler) MPC/MPA emails procurement staff, describing the proposed timeline, shipper info, and attaching shipment documentation:
    • PDF: shipping vendor inquiry email
    • PDF: shipping vendor quote
    • PDF: finalized agreement email (statement of work)
  • Procurement form is completed by MPC
  • Requisition is entered into workday by MPC
  • MPC/MPA confirms shipper arrival times week-of for pickup and drop-off
  • MPC/MPA confirms that invoices have been paid following completion of shipment

Shipping

  • Boxes are migrated following coordination with SFP:
  • IF SHIPPING TO MULTIPLE VENDORS: Print paper signs with the destination city tape to top of each pallet to distinguish multiple shipments to different vendors.
  • Shippers arrive, wrap, and take pallets.
  • Send a list of all out-going container barcodes to LSC Collection Manager.
    • Collection Manager will update location of barcodes in SPEC.

Return Shipment Procedures

  • MPC/MPA contacts digitization vendor to confirm new shipping dates and pallet count.
  • (follow above workflow for shipping procedures)
  • Boxes are checked-in upon arrival or before migration back to SFP staff.
  • Send a list of all incoming container barcodes to LSC Collection Manager
    • Collection Manager will update location of barcodes in SPEC

Considerations

  • Balance LSC storage capacities with incoming and outgoing timelines for all projects

Truck and Dock Requirements

  • Truck must be climate controlled
  • Pallets must not be stacked or dismantled; pallets must be wrapped by shipper
  • Delivery must take place MON-WED or FRI, between 8am-5pm (deliveries not accepted SAT/SUN or any day after 5pm)
  • “Straight truck” required, no more than 27” off ground (dock ceiling is short)
  • Lift gate required, ideally ~94” x 70” (“tractor trailer” or “gesticulating” lift gates are preferred to accommodate the incline of the dock floor.
  • Dock is 29” high from the ground, and only 19.5 ft long; outside of loading dock is a steep incline - short truck required.

Shipping Vendor Info

  • Clancy Relocation & Logistics